6 X 24 + FC

For Crane, Hoist
and
General Engineering Purposes
Construction : 6 Strands
24 Wires per Strand
7 Fiber Core

Diameter Minimum Breaking Load in Metric Tons Approx.Weight
Rope AG A & BG B per Meter
mm (150kg/mm ) (165kg/mm ) (180 kg/mm ) kg/m
6 1.67 1.81 1.97 0.120
6.3 1.84 1.99 2.17 0.132
8 2.97 3.21 3.50 0.212
9 3.75 4.06 4.43 0.269
9.5 4.18 4.53 4.94 0.290
10 4.64 5.02 5.47 0.332
11.2 5.82 6.29 6.86 0.416
12 6.68 7.22 7.87 0.478
12.5 7.25 7.84 8.55 0.519
14 9.09 9.83 10.71 0.651
16 11.9 12.8 14.0 0.85
18 15.0 16.2 17.7 1.08
19.1 16.9 18.4 20.1 1.21
20 18.5 20.1 21.9 1.33
22.4 23.3 25.2 27.5 1.67
24 26.7 28.9 31.5 1.91
25 29.0 31.3 34.1 2.08
26 31.4 33.9 37.0 2.24
28 36.4 39.3 42.8 2.60
30 41.8 45.1 49.2 2.99
31.5 46.0 49.8 54.3 3.29
33.5 52.1 56.3 61.4 3.73
35.5 58.5 63.2 68.9 4.18
37.5 65.2 70.5 76.9 4.67
38 67.0 72.4 78.9 4.79
40 74.2 80.2 87.4 5.31
42.5 83.8 90.6 98.8 6.00
44 89.8 97.1 105.0 6.43
45 94.0 102.0 118.0 6.72
47.5 105.0 113.0 123.0 7.49
50 117.0 125.0 136.0 8.30
53 130.0 141.0 154.0 9.33
56 145.0 157.0 171.0 10.40
58 156.0 169.0 184.0 11.20
60 167.0 180.0 196.0 12.00
63 184.0 199.0 217.0 13.20
67 208.0 225.0 245.0 14.90
71 234.0 253.0 275.0 16.74
75 261.0 281.0 306.0 18.70